阿里翻譯公司關鍵字:constraints. Moreover, there is no comprehensive social credit management services, the lack of effective credit information system integration, did not form an effective monitoring mechanism. Therefore, we must accelerate the pace of credit legislation, the credit in the development of industry specific legislation and the establishment of effective integration of a comprehensive credit information management system to create a legal basis for the socialist market economy, the legal environment.
(2) strengthen the management of pre-approval of construction projects. False floor area of ??building units, design units over an area of ??design of the case, you can strengthen the Government's approval, review of inter-sectoral collaboration, sharing results of building approval to be resolved. That institutions in the construction plan review technical review of construction plans, in addition to construction plan approval agency plans for structural safety and mandatory standards, review the implementation of norms, the construction area should also be accounted for, to confirm whether Planning Board approved the construction of more than engineering program approved by the area of ??indicators. Construction unit approval "construction project planning permit", the review of construction plans must also provide the construction sector accounting area, the planning department issued a "construction project planning license" area control basis. Planning department to confirm the size of the construction plan review submissions and the "construction project planning license" authorized to be issued when an area of ??consistent approval. For the two sets of drawings and the phenomenon of super built, you can improve the operation of the construction plan review ways to resolve them.
(3) to strengthen the planning loft inspection line after the grant regulation. Unauthorized changes to reduce the position of the axis of the behavior leading to increased building area, many additional ± 0.00 inspection line link, will require the construction unit ± 0.00 inspection information submitted to the planning and management department line stamped before entering the next
|